Greenwood Farms Landfill Section 11B

MSW Cell Construction including LCS and underdrain

PROJECT NAME: Greenwood Farms Landfill Section 11B

LOCATION: Tyler, TX

DATE: 3/2016 - 6/2016

SCOPE OF WORK: Construction of a 5.3 acre MSW cell. Includes excavation, general fill, and subgrade preparation; installation of geosynthetic clay liner; installation of a leachate collection system including piping, drainage aggregate and drainage geocomposite; installation of a 2ft thick protective cover; future and existing tie-ins; anchor trench excavation/backfilling; construction of an access road and truck pad; stormwater sump and stormwater channel.