La Gloria Ranch Landfill Cell 2B

MSW Cell Construction including LCS and underdrain

PROJECT NAME: La Gloria Cell 2B

LOCATION: Edinburg, TX

DATE: 3/2016-Current

SCOPE OF WORK: Construction of a 6.51 acre MSW cell. Includes excavation, general fill, and subgrade preparation; installation of a 2ft thick re-compacted clay liner; installation of a leachate collection system including piping, drainage aggregate and drainage geocomposite; installation of a 2ft thick protective cover; future and existing tie-ins; anchor trench excavation/backfilling; construction of an access road and truck pad; stormwater sump.