Golden Triangle Landfill Sector 9B

MSW Cell Construction including LCS and underdrain

PROJECT NAME: Golden Triangle Landfill Sec 9B

LOCATION: Beaumont, TX

DATE: 11/2013-3/2014

SCOPE OF WORK: Construction of a 9.7 acre MSW cell. Includes excavation, general fill, and subgrade preparation; installation of a 2ft thick compacted clay liner; installation of a leachate collection system including piping, drainage aggregate and drainage geocomposite; installation of a 2ft thick protective cover; future and existing tie-ins; anchor trench excavation/backfilling; construction of an access road and truck pad; stormwater sump.