PROJECT NAME: Blue Ridge Landfill
LOCATION: Fresno, TX
DATE: 11/2012-9/2013
SCOPE OF WORK: Construction of an 12AC MSW Cell and 8AC Class 1 Cell. Includes excavation, general fill, and subgrade preparation; installation of an underdrain system including geocomposite, trenches, pipe, aggregate, geotextile wrap, and temporary sump; installation of 2ft thick(MSW) and 3ft thick(Class 1) compacted clay liner; installation of a leachate collection system including 60-mil HDPE geomembrane liner, geocomposite, trenches, pipe, aggregate, geotextile wrap, and temporary sump; installation of 2ft thick protective cover; future and existing tie-ins; construction of a stormwater sump and channels; installation of haul roads and truck pads; leachate and underdrain forcemains;