McCarty Rd Landfill Final Cover (22AC)

Final Cover Landfill Construction.  Includes installation of clay liner, leachate collection and Underdrain systems, Gabion systems

PROJECT NAME: McCarty Rd Landfill Final Cover (22AC)

LOCATION: Houston, TX

DATE: 7/2015 - 4/2016

SCOPE OF WORK: Construction of approx 22AC Final Cover on the northeastern portion of the sideslope area. Includes tie-in to existing final cover; grading and placement of intermediate cover; surface preparation and installation of geosynthetic clay liner (GCL); placement of erosion layer and future final cover tie-in; installation of gabion-lined stormwater chutes and drainage swales; construction of north channel pond and roadway construction.