Separatory Overliner Landfill Construction.  Includes installation of clay liner, leachate collection and Underdrain systems

PROJECT NAME: McCarty Rd Landfill SOS 3B

LOCATION: Houston, TX

DATE: 7/2015 - 5/2016

SCOPE OF WORK: Construction of a 15.5AC Separatory Overliner System (SOS) on the northern portion of the top deck area. Includes cover soil/waste excavation and relocation, waste fill, placement of intermediate cover, and subgrade preparation; installation of leachate collection system; installation of 1ft thick protective cover; preparation and installation of existing and future tie-ins; installation of drainage swales; installation of an access road and truck pad; surface water management; haul road maintenance.